VKE 1000 kVA compact substation acts as a stable bridging interface between high-voltage (HV) networks and low-voltage (LV) networks.

Features

Reliability & Safety

Easy to use with automation

Factory-made for quick installation

Flexible in setup

Cost-effective with fast results

Small in size

Blends well with surroundings

Cabinet

Cabinet

Structure

Key components of the 1000 kVA compact substation provide waterproofing, dustproofing and corrosion resistance for harsh environments.

-Transformer Compartment: The core unit for voltage step-up/step-down conversion.

-Switchgear Compartment: Includes incoming switches, load break switches, disconnectors and combined switches.

-Cable Tunnel: Used for cable maintenance.

-Cabinet Compartment: Ensures proper air conditioning for the substation and serves as a passage for metering, dispatching and monitoring devices.

Auxiliary devices, such as distribution panels and cabinet-type racks, offer circuit protection, control, display and communication functions for the power distribution system.

Control devices include various control panels for operating and monitoring the substation’s functions.

HV Compartment

HV Compartment

Safety Protection Measures

Explosion & Fire Prevention

For environments with explosive gases or fire risks, necessary explosion-proof and fire-resistant measures should be implemented inside the substation, such as using flame-retardant materials.

Five Protection Interlocking Mechanism

1.Prevent accidental opening/closing of circuit breakers

2.Prevent load-breaking disconnect switch operations

3.Prevent live grounding wire installation

4.Prevent energizing with grounding wires connected

5.Prevent unauthorized access to live compartments

Dehumidification

In humid environments, dehumidification devices should be installed inside the enclosure to prevent condensation, thereby protecting electrical components from damage.

Ready-to-ship Finished Products

Ready-to-ship Finished Products

Operation

Daily Inspection

1.Check the substation’s exterior for damage

2.Ensure door locks are intact

3.Verify that ventilation openings are not blocked

Electrical Testing

Conduct preventive tests on the electrical equipment inside the substation at scheduled intervals to ensure they are in good condition.

Regular Maintenance

1.Properly maintain key components

2.Replace aged or damaged parts in time

Fault Handling

1.Respond promptly with corrective measures to restore power supply

2.Document fault details for further analysis and improvement